Production stages
There are 24 control points in laboratories and at production site. Confidence in our products is a result of a thoughtful approach.
QUALITY -
IS OUR TOP PRIORITY
IS OUR TOP PRIORITY
1
Control point in laboratory and at production
AD, Pb0%
AD, Pb0%
2
Control point in laboratory and at production
Conductivity
Conductivity
3
Control point in laboratory and at production
Density,
Trace elements
Density,
Trace elements
4
Control point in laboratory and at production
AD, PbSO4 %
Humidity, Density
AD, PbSO4 %
Humidity, Density
5
Control point in laboratory and at production
(Ca, Sn, Al) %
(Ca, Sn, Al) %
6
Control point in laboratory and at production
(Ca, Sn, Al) %
Weight, dimensions
(Ca, Sn, Al) %
Weight, dimensions
7
Control point in laboratory and at production
(Ca, Sn, Al) %
Weight, dimensions
(Ca, Sn, Al) %
Weight, dimensions
8
Control point in laboratory
Humidity, Pb%
Humidity, Pb%
9
Control point in laboratory
Humidity, rigidity PbO2%, potential with respect to Cd, PbO%, potential with respect to Cd
Humidity, rigidity PbO2%, potential with respect to Cd, PbO%, potential with respect to Cd
10
Control point in laboratory
Dimensions, face
11
Control point in laboratory and at production
Dimensions, humidity
Dimensions, humidity
12
Control point in laboratory and at production
Pressure in the plate pack
Pressure in the plate pack
13
Control point in laboratory and at production
Dimensions, face
14
Control point at production
Face
Face
15
Control point in laboratory and at production
Weight, dimensions, face, hermitization
Weight, dimensions, face, hermitization
16
Control point in laboratory and at production
Face
Face
17
Control point at production
Face, checking for short circuit
Face, checking for short circuit
15
Control point in laboratory and at production
Weight, dimensions, face, hermitization
Weight, dimensions, face, hermitization
18
Control point at production
Face
19
Control point at production
Test for hermitization, Face
Test for hermitization, Face
3
Control point in laboratory and at production
Density, Trace elements
Density, Trace elements
20
Control point in laboratory and at production
Weight of the electrolyte
Weight of the electrolyte
21
Control point at production
Discharge, measurement of the final voltage
Discharge, measurement of the final voltage
15
Control point in laboratory and at production
Weight, dimensions, face, hermitization
Weight, dimensions, face, hermitization
22
Control point at production
Test for hermitization (for capacities <26Ah), no-load voltage, discharge with heavy current
Test for hermitization (for capacities <26Ah), no-load voltage, discharge with heavy current
23
Control point in engineer laboratory
Voltage, internal impedance, capacity,Recharge
in inverted state
Voltage, internal impedance, capacity,Recharge
in inverted state
24
Control point in engineer laboratory
Internal impedance, voltage, capacity
Internal impedance, voltage, capacity
B.B. BATTERY LABORATORIES
Quality control laboratory
Research of the original material
Original material analysis (X-ray structural analysis, spectrum analysis etc.)
Engineering laboratory
Analysis of the final product samples Defects analysis
Technical specifications analysis (samples analysis with electronic microscope, measurement of the electrode potentials, weight, dimensions etc.)
Research laboratory
Research Comparative tests
Confirmation of specifications
Other equipment – chargers, heating / cold rooms, ballast resistance etc.